A priority rule heuristic for the multi-skilled resource-constrained project scheduling problem

被引:0
|
作者
Vermeire, Guillaume [1 ]
Vanhoucke, Mario [1 ,2 ,3 ]
机构
[1] Univ Ghent, Tweekerkenstr 2, B-9000 Ghent, Belgium
[2] Vlerick Business Sch, Reep 1, B-9000 Ghent, Belgium
[3] UCL, Gower St, London WC1E 6BT, England
关键词
Project scheduling; Multi-skilled resources; Priority rules; Heuristic; Resource assignment; MULTIOBJECTIVE EVOLUTIONARY ALGORITHM;
D O I
10.1016/j.asoc.2025.112776
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This research presents a priority rule heuristic approach for the multi-skilled resource-constrained project scheduling problem. The approach is based on a parallel schedule generation scheme which includes anew resource assignment procedure. The scheme combines three types of priority rules in order to schedule activities and assign resources to the skill requirements of these activities. In computational experiments, skill- and resource rule combinations are evaluated and selected based on two metrics using a Pareto Front approach. These rule combinations are then integrated with various activity priority rules after which their solution quality is evaluated. The heuristic approach and the selected rules are then employed to solve all project instances of the MSLIB dataset. It is shown that, on average, the presented approach is able to obtain solutions with a comparable quality to the solution quality of a meta-heuristic procedure from literature. Additionally, new best known solutions are obtained for the MSLIB dataset. The practical applicability of the heuristic is validated by solving empirical project instances.