首页
学术期刊
论文检测
AIGC检测
热点
更多
数据
Indonesia's Pumped Storage Power Plant Project with High-Speed Construction RCC Dams and Large-Scale Underground Powerhouse - Upper Cisokan
被引:0
|
作者
:
Permana, Eka
论文数:
0
引用数:
0
h-index:
0
机构:
UPP JBT 1, PT PLN (Persero), Bandung, Indonesia
UPP JBT 1, PT PLN (Persero), Bandung, Indonesia
Permana, Eka
[
1
]
Permana, Priyagung Bayu
论文数:
0
引用数:
0
h-index:
0
机构:
UPP JBT 1, PT PLN (Persero), Bandung, Indonesia
UPP JBT 1, PT PLN (Persero), Bandung, Indonesia
Permana, Priyagung Bayu
[
1
]
Faza, Alfan
论文数:
0
引用数:
0
h-index:
0
机构:
UPP JBT 1, PT PLN (Persero), Bandung, Indonesia
UPP JBT 1, PT PLN (Persero), Bandung, Indonesia
Faza, Alfan
[
1
]
Kisdarmawan, Surya Dwi
论文数:
0
引用数:
0
h-index:
0
机构:
UPP JBT 1, PT PLN (Persero), Bandung, Indonesia
UPP JBT 1, PT PLN (Persero), Bandung, Indonesia
Kisdarmawan, Surya Dwi
[
1
]
Wardana, Yoga Jaya
论文数:
0
引用数:
0
h-index:
0
机构:
UPP JBT 1, PT PLN (Persero), Bandung, Indonesia
UPP JBT 1, PT PLN (Persero), Bandung, Indonesia
Wardana, Yoga Jaya
[
1
]
Tsutsui, Shoji
论文数:
0
引用数:
0
h-index:
0
机构:
NEWJEC Inc., International Business Division, Osaka, Japan
UPP JBT 1, PT PLN (Persero), Bandung, Indonesia
Tsutsui, Shoji
[
2
]
机构
:
[1]
UPP JBT 1, PT PLN (Persero), Bandung, Indonesia
[2]
NEWJEC Inc., International Business Division, Osaka, Japan
来源
:
ICT-PEP 2024 - International Conference on Technology and Policy in Energy and Electric Power: Resilient Power Systems: Navigating the Clean Energy Transition, Proceedings
|
2024年
关键词
:
Electro-mechanical - High Speed - Indonesia - Power plant projects - Pumped-storage power plant - RCC dams - Underground powerhouse - Variable speed - Variable speed machine - World bank;
D O I
:
暂无
中图分类号
:
学科分类号
:
摘要
:
8
引用
收藏
页码:63 / 67
相关论文
共 1 条
[1]
Limberg III pumped storage power station project – special challenges posed by logistics and the tunnelling systems of a large-scale construction site in a high mountain region
Schorn R.
论文数:
0
引用数:
0
h-index:
0
机构:
Joint venture PSW Limberg III, Site office Kesselfallstraße, Kaprun
Joint venture PSW Limberg III, Site office Kesselfallstraße, Kaprun
Schorn R.
Rieder C.
论文数:
0
引用数:
0
h-index:
0
机构:
Verbund, Site office Kesselfallstraße, Kaprun
Joint venture PSW Limberg III, Site office Kesselfallstraße, Kaprun
Rieder C.
Hager A.
论文数:
0
引用数:
0
h-index:
0
机构:
Marti Tunnel AG, Seedorffeldstr. 21, Moosseedorf
Joint venture PSW Limberg III, Site office Kesselfallstraße, Kaprun
Hager A.
Geomechanik und Tunnelbau,
2022,
15
(05):
: 478
-
490
←
1
→