SOIL STABILISATION IN MINING.

被引:0
|
作者
Mathews, Bruce [1 ]
机构
[1] Bomag Australia Pty Ltd, Aust, Bomag Australia Pty Ltd, Aust
关键词
MINES AND MINING - Control;
D O I
暂无
中图分类号
学科分类号
摘要
Stabilization of existing materials by introducing a stabilizing 'agent' increases load-bearing capacity, assists in repelling water and eliminates the need to transport more stable materials to the site. The most common stabilizing agents used in Australia are portland cement and line. Overseas methods include calcium chloride, bituminous emulsions, fly ash and various other chemicals and combinations.
引用
下载
收藏
页码:9 / 10
相关论文
共 50 条
  • [1] Problems of Soil Mechanics and Drainage in Open Cast Mining.
    Foerster, Wolfgang
    Fischer, Manfred
    Neue Bergbautechnik, 1976, 6 (10): : 747 - 752
  • [2] MICROCOMPUTERS FOR MINING.
    Holt, P.B.
    McCulloch, A.W.
    Colliery guardian Redhill, 1985, 233 (09): : 424 - 426
  • [3] RETREAT MINING.
    Massey, C.T.
    Mining Engineer (London), 1977, 137 (196): : 39 - 43
  • [4] Future of Mining.
    Mel'nikov, N.V.
    Gornyi Zhurnal, 1974, (02): : 3 - 9
  • [5] MEXICAN MINING.
    Terrones, Alberto J.
    Mining Magazine, 1986, 155 (05): : 453 - 459
  • [6] SOLUTION MINING.
    Tweeton, D.R.
    1984, (36)
  • [7] Diamond mining.
    Harbottle, H
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1924, 68 : 827 - 829
  • [8] SOLUTION MINING.
    Shock, D'Arcy A.
    Mining Engineering (Littleton, Colorado), 1977, 29 (02):
  • [9] HEAT MINING.
    Ledingham, Peter
    Mining Magazine, 1986, 154 (03): : 241 - 251
  • [10] UNDERGROUND MINING.
    Anon
    1978, 64 (02): : 75 - 77