The expediency of combined laying of pipelines under urban conditions

被引:0
|
作者
Argunov, S.V.
机构
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:49 / 50
相关论文
共 50 条
  • [1] Reliability analysis of pipelines during laying, considering ultimate strength under combined loads
    Igland, RT
    Moan, T
    JOURNAL OF OFFSHORE MECHANICS AND ARCTIC ENGINEERING-TRANSACTIONS OF THE ASME, 2000, 122 (01): : 40 - 46
  • [2] DYNAMIC BEHAVIOR OF SUBMARINE PIPELINES UNDER LAYING OPERATION
    SUZUKI, N
    JINGU, N
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 1982, 104 (04): : 313 - 318
  • [3] Numerical Simulation of Local Buckling of Submarine Pipelines under Combined Loading Conditions
    Su, Wenxian
    Ren, Jie
    MATERIALS, 2022, 15 (18)
  • [4] LAYING AND PROTECTION OF PIPELINES
    MARLBORO.DE
    WILSON, RA
    CHEMICAL AND PROCESS ENGINEERING, 1969, 50 (11): : 73 - &
  • [5] Coupling model analysis of adjacent buried metal pipelines under harmonic conditions in urban railways
    Li W.
    Xie S.
    Wang H.
    Sui Y.
    Journal of Railway Science and Engineering, 2023, 20 (12) : 4769 - 4780
  • [6] EXPEDIENCY AND DIRECTIONS OF APPLYING PIPELINES AND INSTALLATIONS OF PLASTIC IN HOME INDUSTRY
    JARMULSKI, T
    PRZEMYSL CHEMICZNY, 1976, 55 (04): : 186 - 190
  • [7] EXPEDIENCY OF COMBINED OPERATIONS IN CARCINOMA OF THE STOMACH
    KLIMENKOV, AA
    LETYAGIN, VP
    CHEBOTAREVA, LI
    GUBINA, GI
    GRETSOVA, VI
    KHIRURGIYA, 1979, (12): : 35 - 38
  • [8] EQUILIBRIUM OF MARINE PIPELINES DURING LAYING
    PEDERSEN, PT
    ZEITSCHRIFT FUR ANGEWANDTE MATHEMATIK UND MECHANIK, 1978, 58 (06): : T228 - T230
  • [10] VIV analysis of pipelines under complex span conditions
    Wang, James
    Wang, F. Steven
    Duan, Gang
    Jukes, Paul
    JOURNAL OF MARINE SCIENCE AND APPLICATION, 2009, 8 (02) : 105 - 109