共 50 条
- [1] Public works construction practice in Saudi Arabia [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 1995, 20 (4A): : 623 - 634
- [2] Risk assessment and allocation in the contract for public works used in Saudi Arabia construction industry [J]. COGENT ENGINEERING, 2018, 5 (01): : 1 - 21
- [3] SETTING CONSTRUCTION CONTRACT DURATION - PUBLIC PROJECTS IN SAUDI-ARABIA - DESCRIPTION OF THE PRACTICE USED BY THE PUBLIC AGENCIES IN SETTING CONSTRUCTION CONTRACT DURATION, CCD, IN SAUDI-ARABIA [J]. BUILDING RESEARCH AND INFORMATION, 1994, 22 (04): : 211 - 213
- [4] Value engineering in public construction projects in Saudi Arabia [J]. BUILDING RESEARCH AND INFORMATION, 1996, 24 (03): : 152 - 158
- [6] CONTRACTOR FINANCING, PUBLIC-WORKS IN SAUDI-ARABIA [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (01): : 1 - 14
- [8] Consequences of owner-set duration of public construction projects in Saudi Arabia [J]. Cost Engineering (Morgantown, West Virginia), 1994, 36 (02): : 23 - 25
- [10] Risks associated with trenching works in Saudi Arabia [J]. BUILDING AND ENVIRONMENT, 2008, 43 (05) : 776 - 781