共 5 条
- [1] Concrete placing construction of shiplock's ground works Renmin Changjiang/Yangtze River, 2001, 32 (08): : 34 - 36
- [2] On quality management and control of shiplock's ground works Renmin Changjiang/Yangtze River, 2001, 32 (08): : 53 - 54
- [3] Excavation and anchoring treatment on f1096 fault at TGP's shiplock construction site Renmin Changjiang/Yangtze River, 2003, 34 (09):
- [4] Using 3-C uphole survey technique to survey P-wave and S-wave velocity on surface Shiyou Diqiu Wuli Kantan/Oil Geophysical Prospecting, 2006, 41 (02): : 160 - 165