DRILLING SYSTEM SOLVES CHIP-REMOVAL PROBLEM.

被引:0
|
作者
Calcaterra, Paul [1 ]
机构
[1] GTE Valeron Corp, Madison Heights,, MI, USA, GTE Valeron Corp, Madison Heights, MI, USA
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:72 / 75
相关论文
共 50 条
  • [1] INNOVATIVE WATER SYSTEM SOLVES QUALITY PROBLEM.
    Roller, John A.
    Moline, Walter N.
    [J]. 1978, 125 (11): : 70 - 73
  • [2] HYDRAULIC CLAMPING FOR CHIP-REMOVAL MACHINING
    HUBNER, R
    [J]. WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1981, 71 (11): : 691 - 695
  • [3] TECHNIQUE SOLVES TRANSPORTATION PROBLEM.
    Patel, Himanshu M.
    [J]. Industrial engineering Norcross, Ga., 1988, 20 (03): : 20 - 23
  • [4] TI SOLVES WICKING PROBLEM.
    McLellan, R.Neil
    Schroen, Walter H.
    [J]. Circuits manufacturing, 1987, 27 (09): : 78 - 85
  • [5] SURGE RELIEF SYSTEM SOLVES SOVIET PIPE LINE PROBLEM.
    Anon
    [J]. Pipe line industry Houston, Tex., 1979, 51 (05): : 101 - 103
  • [6] PREFABRICATION SOLVES STAIRCASE CONSTRUCTION PROBLEM.
    Holdsworth, Stuart
    Swain, Alec
    [J]. Metal construction, 1986, 18 (03): : 164 - 165
  • [7] DIAMOND SAWING SOLVES CAMBRIDGE PROBLEM.
    Anon
    [J]. Civil engineering London, 1983, : 29 - 30
  • [8] MODIFIED CRUSHER SOLVES WEAR PROBLEM.
    Anon
    [J]. Quarry Management, 1987, 14 (09): : 17 - 18
  • [9] CONCRETE SOLVES UNUSUAL SITE PROBLEM.
    Ferreri, Joseph P.
    [J]. Concrete International, 1984, 6 (03) : 69 - 71
  • [10] CALCULATION OF OPTIMUM CHIP-REMOVAL VALUES WITH A POCKET CALCULATOR
    BETHLEHEM, WF
    [J]. WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1985, 75 (10): : 629 - 632