Identification of factors influencing implementation of construction robotics

被引:0
|
作者
Kangari, R. [1 ]
Halpin, D.W. [2 ]
机构
[1] Georgia Institute of Tech, School of Civil Engineering, Atlanta,GA,30332, United States
[2] Professor and Head, Division of Construction Engineering and Management, Purdue University, West Lafayette,IN,47907, United States
关键词
Fuzzy set theory - Materials handling - Robots - Construction;
D O I
10.1080/01446199000000008
中图分类号
学科分类号
摘要
The objective of this paper is to describe major factors influencing the robotization of construction processes, and to provide a model based on fuzzy set theory for feasibility analysis of robots. Major factors influencing implementation of construction robots are described. The primary factors driving the adoption of robotics in construction are identified as: (1) need-based feasibility, (2) technological feasibility, and (3) economic feasibility. In order to concentrate on processes which have potential and exclude those processes which are not strong candidates for automation, brainstorming sessions were held with various parties involved in construction to examine feasibility of construction processes for automation. The participants were asked to consider construction processes from the heavy and highway, building and industrial construction areas. © 1990, Copyright Taylor & Francis Group, LLC.
引用
收藏
页码:89 / 104
相关论文
共 50 条
  • [1] Factors Influencing Adoption and Integration of Construction Robotics and Automation Technology in the US
    Bademosi, Fopefoluwa
    Issa, Raja R. A.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (08)
  • [2] Factors influencing the implementation of a safety management system for construction sites
    Ismail, Zubaidah
    Doostdar, Samad
    Harun, Zakaria
    SAFETY SCIENCE, 2012, 50 (03) : 418 - 423
  • [3] Factors influencing buildability assessment implementation in the Nigerian construction industry
    Osuizugbo, Innocent Chigozie
    Okolie, Kevin Chuks
    Oyeyipo, Opeyemi Olanrewaju
    CONSTRUCTION INNOVATION-ENGLAND, 2023, 23 (05): : 917 - 938
  • [4] CONSTRUCTION AUTOMATION AND ROBOTICS PATHWAY TO IMPLEMENTATION
    BOLES, WW
    MAXWELL, DA
    SCOTT, WD
    HEERMANN, PD
    YARBOROUGH, T
    UNDERWOOD, J
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (01): : 143 - 152
  • [5] Construction automation and robotics - pathway to implementation
    Boles, Walter W.
    Maxwell, Donald A.
    Scott, Wesley D.
    Heermann, Philip D.
    Yarborough, Tom
    Underwood, Jon
    Journal of Construction Engineering and Management, 1995, 121 (01): : 143 - 152
  • [6] Factors Influencing Adoption of Construction Robotics in Hong Kong's Industry: A Multistakeholder Perspective
    Law, Kwok Kwan
    Chang, Siwei
    Siu, Ming-Fung Francis
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2022, 38 (02)
  • [7] Identification of Factors Influencing Development of Photovoltaic (PV) Implementation in Singapore
    Lau, Siu-Kit
    Kosoric, Vesna
    Bieri, Monika
    Nobre, Andre. M.
    SUSTAINABILITY, 2021, 13 (05) : 1 - 32
  • [8] Identification of factors influencing communication between participants in construction projects
    Liu, Yan
    Baldwin, Rew N.
    Shen, L. Y.
    Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 291 - 299
  • [9] Key factors influencing the implementation of three-dimensional printing in construction
    Umar, Tariq
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2021, 174 (03) : 104 - 117
  • [10] ROBOTICS IN CONSTRUCTION - IMPLEMENTATION AND ECONOMIC-EVALUATION
    MOSELHI, O
    HASON, S
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1989, 16 (05) : 678 - 683