共 50 条
- [1] Project compares brackish water desalination technologies -Part I Water Engineering and Management, 2002, 149 (02): : 14 - 17
- [2] Water Supply System Performance for Different Pipe Materials Part I: Water Quality Analysis Water Resources Management, 2008, 22 : 1579 - 1607
- [3] CZECHOSLOVAKIA - ITS PROBLEMS OF WATER SUPPLY AND POLLUTION .I. EFFLUENT & WATER TREATMENT JOURNAL, 1967, 7 (05): : 262 - &
- [5] Study on water hammer control by one-way surge tank in long-distance water-supply project Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2011, 30 (01): : 49 - 56
- [6] A calculation of incomplete-phase operating conditions of three-phase transformers. Part I Elektrichestvo, 2003, (09): : 54 - 61
- [7] SLIDING FAILURE MECHANISM AND STABILITY ANALYSIS OF EXPANSIVE CANAL SLOPE IN NORTH XINJIANG WATER SUPPLY PHASE I PROJECT Gongcheng Lixue/Engineering Mechanics, 2023, 40 (03): : 129 - 140and188
- [9] Friction of rubber sliding against ceramics Part I - Dry and water lubricated conditions KGK-KAUTSCHUK GUMMI KUNSTSTOFFE, 2007, 60 (06): : 322 - 327