共 50 条
- [4] Pump maker cuts lead times to production and assembly Manufacturing Computer Solutions, 2002, 8 (03): : 48 - 49
- [7] METHOD TO DETERMINE OPTIMAL MACHINE CYCLE TIMES BASED ON DISTRIBUTION OF MICROINSTRUCTION EXECUTION TIMES. Systems, computers, controls, 1980, 11 (06): : 78 - 87