DEEPWATER MOORING SYSTEM HELPS SAVE TIME.

被引:0
|
作者
Moore III, W.D.
机构
来源
Oil and Gas Journal | 1976年 / 74卷 / 25期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
OIL WELL DRILLING
引用
收藏
页码:124 / 126
相关论文
共 50 条
  • [1] A combined riser mooring system for deepwater applications
    Hogg, B
    Harte, AM
    Grealish, F
    JOURNAL OF OFFSHORE MECHANICS AND ARCTIC ENGINEERING-TRANSACTIONS OF THE ASME, 2004, 126 (04): : 273 - 279
  • [2] Deepwater mooring system using CT technology
    Head, Phil
    Turner, Dan
    French, David
    Atkins, W.S.
    Hanson, Tim
    Cameron, Gerry
    Hess, Amerada
    Proceedings of the SPE/ICoTA Coiled Tubing Roundtable Conf, 1999, : 269 - 277
  • [3] A hybrid approach for turret deepwater mooring system
    Shin, H
    Kim, T
    Lee, H
    Kim, J
    DEEPWATER MOORING SYSTEMS: CONCEPTS, DESIGN, ANALYSIS AND MATERIALS, 2003, : 227 - 238
  • [4] Advanced deepwater mooring
    Trident Offshore
    J Offshore Technol, 2 (22-24):
  • [5] Polyester mooring stiffness modeling for deepwater floating system
    Chen Yongjun
    Qu Yan
    Zhang Tianyu
    EngineeringSciences, 2013, 11 (04) : 48 - 54
  • [6] A hybrid model test of a deepwater OTEC mooring system
    Hong, S
    Kim, JH
    Hong, SW
    Jalihal, P
    Ravindran, M
    PROCEEDINGS OF THE FOURTEENTH (2004) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 1, 2004, : 183 - 188
  • [7] Threaded riser connectors save time in deepwater installation
    Brashier, S
    Roche, JR
    OIL & GAS JOURNAL, 1996, 94 (20) : 78 - &
  • [8] Threaded riser connectors save time in deepwater installation
    Enserch Exploration Inc, Houston, United States
    Oil Gas J, 20 (78-83):
  • [9] Optimization for mooring system of a deepwater semi-submersible platform
    Wang H.-R.
    Pan F.-H.
    Shan T.-B.
    Zhang H.-B.
    Chuan Bo Li Xue/Journal of Ship Mechanics, 2020, 24 (07): : 900 - 907
  • [10] Mooring systems in deepwater fields
    Ahjem, Vidar
    Gordon, Robert
    OIL & GAS JOURNAL, 2012, : 50 - 53