Optimization of Work Schedules in Construction Industry.

被引:0
|
作者
Koerner, H. [1 ]
机构
[1] Gesamthochschule-Bibliothek Kassel, Kassel, West Ger, Gesamthochschule-Bibliothek Kassel, Kassel, West Ger
来源
Bauingenieur Berlin | 1985年 / 60卷 / 08期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
CONSTRUCTION INDUSTRY
引用
收藏
页码:325 / 328
相关论文
共 50 条
  • [1] ABSENTEEISM IN CONSTRUCTION INDUSTRY.
    Hinze, Jimmie
    Ugwu, Maxwell
    Hubbard, Larry
    Journal of Management in Engineering, 1985, 1 (04) : 188 - 200
  • [2] CAD in the Construction Industry.
    De Roeck, G.
    Vanoverschelde, C.
    Ingenieursblad, 1987, 56 (7-8): : 431 - 440
  • [3] ROBOTS IN THE CONSTRUCTION INDUSTRY.
    Warszawski, A.
    Robotica, 1986, 4 (pt 3): : 181 - 188
  • [4] INFLATION AND THE CONSTRUCTION INDUSTRY.
    Stukhart, George
    Journal of the Construction Division, 1982, 108 (CO4): : 546 - 562
  • [5] The economics of the construction industry.
    Warnke, J
    MONTHLY LABOR REVIEW, 1998, 121 (04) : 51 - 52
  • [6] LATEX IN THE CONSTRUCTION INDUSTRY.
    Dennis, Reg
    Chemistry and Industry (London), 1985, (15): : 505 - 511
  • [7] PUMPS IN THE CONSTRUCTION INDUSTRY.
    Lamont, T.A.
    Pumps-Pompes-Pumpen, 1977, (133): : 403 - 405
  • [8] Repetitive work in industry.
    不详
    BRITISH MEDICAL JOURNAL, 1925, 1925 : 391 - 391
  • [9] SMALL FIRMS IN THE CONSTRUCTION INDUSTRY.
    Edmonds, G.A.
    Slater, D.
    1973, 68 (802): : 408 - 415
  • [10] Software solutions for the construction industry.
    不详
    BAUINGENIEUR, 2010, 85 : A9 - A9