PRIMARY CONTAINMENT VESSEL FOR HAMAOKA NUCLEAR POWER STATION UNIT NO. 3, THE CHUBU ELECTRIC POWER CO. , INC.

被引:0
|
作者
Okamoto, Atsumi [1 ]
Nakamura, Seiji [1 ]
机构
[1] IHI, Nuclear Power Div, Jpn, IHI, Nuclear Power Div, Jpn
来源
关键词
POWER PLANTS - Components;
D O I
暂无
中图分类号
学科分类号
摘要
A containment vessel was developed to improve workability and minimize exposure of maintenance workers to radiation through the enlargement of the vessel and improvement of the intravessel equipment layout as a link of the MITI (Ministry of International Trade and Industry)-led project to improve and standardize lightwater nuclear power plant. The vessel is composed of a dry well in which a reactor pressure vessel is housed and a suppression chamber which stores about 3,800 m**3 of pool water.
引用
收藏
页码:199 / 201
相关论文
共 50 条
  • [31] Development of an automated remote inspection system for the interior of the primary containment vessel of a nuclear power plant
    Senoo, M
    Yoshida, T
    Omote, T
    Tanaka, K
    Koga, K
    JOURNAL OF THE ATOMIC ENERGY SOCIETY OF JAPAN, 1996, 38 (07): : 616 - 626
  • [32] ADVANCED CONSTRUCTION TECHNOLOGIES FOR THE OHMA NUCLEAR POWER PLANT REACTOR BUILDING OF ELECTRIC POWER DEVELOPMENT CO., LTD
    Obata, Tatsuya
    Urashima, Akihito
    Watanabe, Kiyokatsu
    Miyahara, Tsumoru
    PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 6, 2011, : 325 - +
  • [33] FEATURES OF IMPROVED TECHNOLOGY IN TOMARI NUCLEAR-POWER STATION - HOKKAIDO-ELECTRIC-POWER-CO
    YASUI, Y
    KITAMURA, T
    JOURNAL OF THE ATOMIC ENERGY SOCIETY OF JAPAN, 1989, 31 (05): : 541 - 548
  • [34] Comprehensive Analysis and Evaluation of Fukushima Daiichi Nuclear Power Station Unit 3
    Yamashita, Takuya
    Honda, Takeshi
    Mizokami, Masato
    Nozaki, Kenichiro
    Suzuki, Hiroyuki
    Pellegrini, Marco
    Sakai, Takeshi
    Sato, Ikken
    Mizokami, Shinya
    NUCLEAR TECHNOLOGY, 2023, 209 (06) : 902 - 927
  • [35] Thermal and chemical tests of the steam generator of unit 3 at the Kalinin nuclear power station
    Davidenko N.N.
    Trunov N.B.
    Saakov E.S.
    Berezanin A.A.
    Bogomolov I.N.
    Derii V.P.
    Nemytov D.S.
    Usanov D.A.
    Shestakov N.B.
    Shchelik S.V.
    Thermal Engineering, 2007, 54 (12) : 971 - 980
  • [36] Evaluation of Molten Corium Spreading and Sedimentation Behaviors Within Primary Containment Vessel in Unit 3 of Fukushima Daiichi Nuclear Power Plant Toward the Best Prediction of Fuel Debris Distribution
    Yokoyama, Ryo
    Kondo, Masahiro
    Suzuki, Shunichi
    Journeau, Christophe
    Pellegrini, Marco
    Okamoto, Koji
    NUCLEAR TECHNOLOGY, 2024, 210 (05) : 884 - 905
  • [37] TESTING THE PRIMARY CONTROL-SYSTEM IN UNIT-2 OF THE PHILIPPSBURG NUCLEAR-POWER STATION
    LANGETEPE, G
    KLEIN, KL
    EHRLICH, WJ
    DIEGEL, D
    ATOMWIRTSCHAFT-ATOMTECHNIK, 1987, 32 (10): : 507 - 509
  • [38] SUPPLY OF THE BALANCE OF PRIMARY PLANT FOR Ko-Ri NUCLEAR POWER STATION UNIT 1.
    Bowles, L.F.
    Collis-Smith, J.A.
    Nuclear Energy, 1980, 19 (05): : 361 - 368
  • [39] Analysis of the accident in the Fukushima Daiichi nuclear power station Unit 3 with MELCOR_2.1
    Fernandez-Moguel, L.
    Birchley, J.
    ANNALS OF NUCLEAR ENERGY, 2015, 83 : 193 - 215
  • [40] NEW ENGINEERING METHOD APPLIED IN CONSTRUCTION FOR IKATA P/S UNIT-2, SHIKOKU ELECTRIC POWER CO.
    Anon
    Mitsubishi Genshiryoku Giho, 1982, (28): : 17 - 20