共 50 条
- [2] CONSTRUCTION ESTIMATING GUIDELINES. PART I - TYPES OF ESTIMATES. Plant Engineering (Barrington, Illinois), 1984, 38 (16): : 69 - 71
- [8] SYSTEM FOR IMPROVING THE ACCURACY OF COST ESTIMATES. Production and inventory management Washington, D.C., 1986, 27 (04): : 89 - 101