Renewal of plate production facilities

被引:0
|
作者
Hoshi, Toshihiro
Kishi, Nobuyuki
Kaneoka, Yoshio
Hamada, Shigeyuki
机构
来源
Sumitomo Metals | 1998年 / 50卷 / 01期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:62 / 70
相关论文
共 50 条
  • [1] RENEWAL AND OPERATION OF MAIN FACILITIES AT KASHIMA PLATE MILL.
    Yoshimatsu, Yukitoshi
    Takeda, Toshihiko
    Kobayashi, Yoshihei
    Ushio, Kunihiko
    Hashizume, Fujihiko
    Sumitomo Metals, 1988, 40 (01): : 71 - 80
  • [3] Inventory system with renewal demands at service facilities
    Yadavalli, V. S. S.
    Sivakumar, B.
    Arivarignan, G.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 114 (01) : 252 - 264
  • [4] Production and Facilities
    Marques, Débora Salomon
    JPT, Journal of Petroleum Technology, 2022, 74 (12): : 56 - 57
  • [5] Production and facilities
    Saadawi, Hisham
    JPT, Journal of Petroleum Technology, 2013, 65 (12):
  • [6] Production and facilities
    Frankiewicz, Ted (tfrankiewicz@specservices.com), 1600, Society of Petroleum Engineers (SPE) (68):
  • [7] Production and facilities
    Bailey, William
    JPT, Journal of Petroleum Technology, 2020, 72 (12):
  • [8] Production/facilities
    Skeels, Brian
    JPT, Journal of Petroleum Technology, 2008, 60 (12):
  • [9] Production and Facilities
    Bailey, William
    JPT, Journal of Petroleum Technology, 2021, 73 (12):
  • [10] Production and facilities
    Frankiewicz, Ted
    JPT, Journal of Petroleum Technology, 2019, 71 (12):