Asymptotic two-phase algorithm to minimize total flow time for a two-machine flowshop

被引:0
|
作者
Natl Taiwan Inst of Technology, Taipei, Taiwan [1 ]
机构
来源
Int J Syst Sci | / 10卷 / 925-930期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [11] A Two-Machine Flowshop Scheduling Problem with a Job Precedence Constraint to Minimize the Total Completion Time
    Xu, Jianyou
    Lin, Win-Chin
    Yin, Yunqiang
    Cheng, Yu
    Wu, Chin-Chia
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2017, 76 (12): : 761 - 766
  • [12] Two-machine flowshop scheduling with job class setups to minimize total flowtime
    Wang, XL
    Cheng, TCE
    COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (11) : 2751 - 2770
  • [13] Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration
    Shiau, Yau-Ren
    Lee, Wen-Chiung
    Wu, Chin-Chia
    Chang, Chia-Ming
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 34 (7-8): : 774 - 782
  • [14] Batching and scheduling to minimize the makespan in the two-machine flowshop
    Cheng, TCE
    Wang, GQ
    IIE TRANSACTIONS, 1998, 30 (05) : 447 - 453
  • [15] Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration
    Yau-Ren Shiau
    Wen-Chiung Lee
    Chin-Chia Wu
    Chia-Ming Chang
    The International Journal of Advanced Manufacturing Technology, 2007, 34 : 774 - 782
  • [16] Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration
    Shiau, Yau-Ren
    Lee, Wen-Chiung
    Wu, Chin-Chia
    Chang, Chia-Ming
    International Journal of Advanced Manufacturing Technology, 2007, 34 (7-8): : 774 - 782
  • [17] Two-machine flowshop scheduling problem to minimize total completion time with bounded setup and processing times
    Allahverdi, A
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 103 (01) : 386 - 400
  • [18] The two-machine flowshop no-wait scheduling problem with a single server to minimize the total completion time
    Su, Ling-Huey
    Lee, Yuan-Yu
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (09) : 2952 - 2963
  • [19] Two-machine flowshop scheduling to minimize the number of tardy jobs
    Gupta, JND
    Hariri, AMA
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1997, 48 (02) : 212 - 220
  • [20] Minimizing the Total Completion Time in a Two-machine Flowshop with Release Times
    Gong, Hua
    Chen, Daheng
    PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, : 4136 - 4140