ARTIFICIAL INTELLIGENCE TECHNIQUES FOR GENERATING CONSTRUCTION PROJECT PLANS.

被引:0
|
作者
Levitt, Raymond [1 ]
Kartam, Nabil [1 ]
Kunz, John [1 ]
机构
[1] Stanford Univ, Stanford, CA, USA, Stanford Univ, Stanford, CA, USA
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:329 / 343
相关论文
共 50 条
  • [1] ARTIFICIAL-INTELLIGENCE TECHNIQUES FOR GENERATING CONSTRUCTION PROJECT PLANS
    LEVITT, RE
    KARTAM, NA
    KUNZ, JC
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1988, 114 (03): : 329 - 343
  • [2] Lean Construction Strategies Supported by Artificial Intelligence Techniques for Construction Project Management-A Review
    Velezmoro-Abanto, Lesly
    Cuba-Lagos, Rocko
    Taico-Valverde, Bryan
    Iparraguirre-Villanueva, Orlando
    Cabanillas-Carbonell, Michael
    INTERNATIONAL JOURNAL OF ONLINE AND BIOMEDICAL ENGINEERING, 2024, 20 (03) : 99 - 114
  • [3] Generating BIM model from structural and architectural plans using Artificial Intelligence
    Urbieta, Martin
    Urbieta, Matias
    Laborde, Tomas
    Villarreal, Guillermo
    Rossi, Gustavo
    JOURNAL OF BUILDING ENGINEERING, 2023, 78
  • [4] ARTIFICIAL INTELLIGENCE (AI) TECHNIQUES FOR MAXIMIZING VALUE OF POWER GENERATING ASSETS
    Raj, Komandur Sunder
    PROCEEDINGS OF THE ASME POWER CONFERENCE, 2018, VOL 2, 2018,
  • [5] ARTIFICIAL INTELLIGENCE PLANNING TECHNIQUES FOR ADAPTIVE VIRTUAL COURSE CONSTRUCTION
    Dario Duque, Nestor
    Arturo Ovalle, Demetrio
    DYNA-COLOMBIA, 2011, 78 (170): : 70 - 78
  • [6] CONSTRUCTION OF METABOLIC MODELS USING ARTIFICIAL-INTELLIGENCE TECHNIQUES
    GARFINKEL, D
    KOHN, MC
    ACHS, MJ
    GARFINKEL, L
    KULIKOWSKI, CA
    ARTIFICIAL INTELLIGENCE IN SCIENTIFIC COMPUTATION : TOWARDS SECOND GENERATION SYSTEMS, 1989, 2 : 225 - 231
  • [7] Generating educational mobile applications using UIDPs identified by artificial intelligence techniques
    Nely Sanchez-Morales, Laura
    Alor-Hernandez, Giner
    Yarel Rosales-Morales, Viviana
    Augusto Cortes-Camarillo, Cesar
    Luis Sanchez-Cervantes, Jose
    COMPUTER STANDARDS & INTERFACES, 2020, 70
  • [8] PROCEDURES AND TABLES FOR CONSTRUCTION AND SELECTION OF REPETITIVE GROUP SAMPLING (RGS) PLANS.
    Soundararajan, V.
    Ramaswamy, M.M.
    QR journal, 1986, 13 (03): : 19 - 21
  • [9] The Application of BIM in Artificial Intelligence Management of Construction Engineering Database Project
    Li, Yiqiao
    2019 4TH INTERNATIONAL WORKSHOP ON MATERIALS ENGINEERING AND COMPUTER SCIENCES (IWMECS 2019), 2019, : 344 - 349
  • [10] TECHNIQUES OF ARTIFICIAL INTELLIGENCE FOR THE DETERMINATION OF THE OPTIMAL INVERSION TIME: THE THAITI PROJECT
    Torlasco, Camilla
    Papetti, Daniele M.
    Sabatini, Maria
    Muscogiuri, Giuseppe
    Castelletti, Silvia
    Xue, Hui
    Kellman, Peter
    Parati, Gianfranco
    Badano, Luigi P.
    Nobile, Marco S.
    Besozzi, Daniela
    EUROPEAN HEART JOURNAL SUPPLEMENTS, 2022, 24