共 50 条
- [1] TEST FILL AT CHEK LAP KOK, HONG-KONG [J]. JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1987, 113 (02): : 106 - 126
- [2] TEST FILL AT CHEK LAP KOK, HONG-KONG - CLOSURE [J]. JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1988, 114 (09): : 1063 - 1064
- [3] TEST FILL AT CHEK-LAP-KOK, HONG-KONG - DISCUSSION [J]. JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1988, 114 (09): : 1061 - 1063
- [4] INSTRUMENTATION FOR TEST FILL IN HONG KONG. [J]. Journal of geotechnical engineering, 1987, 113 (02): : 127 - 146
- [5] The use of geophysics at the new airport, Chek Lap Kok, Hong Kong [J]. MODERN GEOPHYSICS IN ENGINEERING GEOLOGY, 1997, (12): : 223 - 233
- [6] Site characterization for Hong Kong's new airport at Chek Lap Kok [J]. GEOTECHNICAL SITE CHARACTERIZATION, VOLS 1 AND 2, 1998, : 177 - 182
- [7] Vacuum drainage to accelerate submarine consolidation at Chek Lap Kok, Hong Kong [J]. Ground Eng, 6 (34):
- [8] Vacuum drainage to accelerate submarine consolidation at Chek Lap Kok, Hong Kong [J]. GROUND ENGINEERING, 1997, 30 (06): : 34 - 36
- [10] Transportation Planning and Development in Hong Kong's Future Airport: Chek Lap Kok [J]. FIRST CONFERENCE OF HONG KONG SOCIETY FOR TRANSPORTATION STUDIES, 1996, : 243 - 254