Operating Experience with Pipework and Valves in the Bexbach 750 MW Power Plant.

被引:0
|
作者
Rost, M.
机构
来源
VGB-Kraftwerkstechnik | 1987年 / 67卷 / 08期
关键词
STEAM PIPING SYSTEMS - Fluid Dynamics - VALVES AND VALVE GEAR - Fluid Dynamics;
D O I
暂无
中图分类号
学科分类号
摘要
The Bexbach 750 MW power plant unit has been installed for medium-load operation. This mode of operation is distinguished by frequent plant start-up and shutdown. This paper reports on the operational experience with high-pressure pipework and valves. In addition to regular inspection of the pipework routes, particular attention is paid to the operational performance, during numerous unit start-ups of pipework subject to irregular flow.
引用
收藏
页码:786 / 803
相关论文
共 50 条
  • [1] Electricity from Pit Coal - Bexbach Power Plant.
    Abroell, Georg
    BBC-Nachrichten (Brown, Boveri & Cie), 1984, 66 (04): : 141 - 148
  • [2] Operating Experience in the Krsko Nuclear Power Plant.
    Dular, J
    VGB-Kraftwerkstechnik, 1987, 67 (08): : 745 - 746
  • [3] PROLONGED OPERATING EXPERIENCE OF AN ELECTRODIALYSIS PLANT.
    Vysotskii, S.P.
    Ryazhechkin, V.Ya.
    Dyachenko, A.P.
    Lebedev, V.Yu.
    Soviet journal of water chemistry and technology, 1987, 9 (04): : 80 - 84
  • [4] OPERATING EXPERIENCE WITH THE KARLSRUHE REPROCESSING PLANT.
    Schueller, Walter
    Atomkernenergie, Kerntechnik, 1985, 47 (02): : 77 - 82
  • [5] EXPERIENCE WITH INSTALLATION OF A COMPUTER BASED INFORMATION SYSTEM IN AN OPERATING NUCLEAR POWER PLANT.
    Gucwa, L.T.
    Hart, S.C.
    Mahaffey, J.A.
    Springer, P.L.
    Wahab, E.Z.
    IEEE Transactions on Nuclear Science, 1984, NS-32 (01) : 1133 - 1144
  • [6] 30-year experience of operating the Krasnoyarsk hydroelectric power plant. Hydroelectric generators
    Latyshev, V.I.
    Khikhol, A.M.
    Sokolov, A.E.
    Energetik, (12): : 4 - 5
  • [7] 150 MW Generating Gas Turbine Power Plant.
    Bodrov, I.S.
    Ogurtsov, A.P.
    Reznichenko, V.Ya.
    Teploenergetika, 1979, (11): : 11 - 17
  • [8] HERA helium refrigerator plant. Description and operating experience
    Herzog, H.
    Wegmann, U.
    Beurer, P.
    Egolf, H.
    Wettstein, J.
    Ziegler, B.
    Clausen, M.
    Fiebig, H.J.
    Gerke, Ch.
    Horlitz, G.
    Lierl, H.
    Nowakowsky, K-D.
    Proceedings of the International Cryogenic Engineering Conference, 1988, (12):
  • [9] OPERATING EXPERIENCE AT THE MALMBERGET STRAIGHT GRATE PELLETIZING PLANT.
    Odman, R.R.
    Lofgren, O.N.
    Mining Engineering, 1982, 34 (06) : 690 - 694
  • [10] DEVELOPMENT OF 1 MW CENTRALIZED PV POWER PLANT.
    Takahashi, M.
    Hosokawa, H.
    Takeda, Y.
    Takigawa, K.
    Conference Record of the IEEE Photovoltaic Specialists Conference, 1984, : 1031 - 1035