SETTING HIGHWAY CONSTRUCTION CONTRACT DURATION

被引:0
|
作者
Hancher, Donn E.
Rowings, James E.
机构
来源
Journal of the Construction Division | 1981年 / 107卷 / 02期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
CONSTRUCTION INDUSTRY
引用
收藏
页码:169 / 179
相关论文
共 50 条
  • [1] SETTING HIGHWAY CONSTRUCTION CONTRACT DURATION
    HANCHER, DE
    ROWINGS, JE
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1981, 107 (02): : 169 - 179
  • [2] SETTING CONSTRUCTION CONTRACT DURATION - PUBLIC PROJECTS IN SAUDI-ARABIA - DESCRIPTION OF THE PRACTICE USED BY THE PUBLIC AGENCIES IN SETTING CONSTRUCTION CONTRACT DURATION, CCD, IN SAUDI-ARABIA
    ALMOHAWIS, SA
    ALSULTAN, AS
    BUILDING RESEARCH AND INFORMATION, 1994, 22 (04): : 211 - 213
  • [3] The Study on Risk and Countermeasure of Highway Engineering Construction Contract
    Li, Weifang
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1940 - 1943
  • [4] A Reliability Model for Road Construction Contract Duration
    Podder, Subir Kumar
    INTERNATIONAL CONFERENCE ON TRANSPORTATION AND DEVELOPMENT 2021: TRANSPORTATION PLANNING AND DEVELOPMENT, 2021, : 83 - 90
  • [5] Determining Highway Project Contract Time from Project Duration Estimates
    Le, Chau
    Jeong, H. David
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2023, 15 (03)
  • [6] Using Parametric Modeling to Estimate Highway Construction Contract Time
    Zhai, Dong
    Shan, Yongwei
    Sturgill, Roy E.
    Taylor, Timothy R. B.
    Goodrum, Paul M.
    TRANSPORTATION RESEARCH RECORD, 2016, (2573) : 1 - 9
  • [7] Complexity in the Evaluation of Contract Types Employed for the Construction of Highway Projects
    Antoniou, Fani
    Aretoulis, Georgios N.
    Konstantinidis, Dimitrios
    Kalfakakou, Glykeria P.
    SELECTED PAPERS FROM THE 26TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), WORLD CONGRESS, 2013, 74 : 448 - 458
  • [8] Engineers' Perception of Contract Types' Performance for Highway Construction Projects
    Antoniou, Fani
    Aretoulis, Georgios N.
    Konstantinidis, Dimitrios
    Kalfakakou, Glykeria P.
    INTERNATIONAL JOURNAL OF APPLIED BEHAVIORAL ECONOMICS, 2013, 2 (04) : 1 - 24
  • [9] Forecasting final budget and duration of highway construction projects
    Pewdum, Wichan
    Rujirayanyong, Thammasak
    Sooksatra, Vanee
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2009, 16 (06) : 544 - +
  • [10] SETTING CONTRACT PRICES FOR CONSTRUCTION OF WELLS WITH ACCOUNT OF THEIR QUALITY
    LAZARYAN, BS
    NEFTYANOE KHOZYAISTVO, 1991, (01): : 2 - 4