Freeway on-ramp design criteria for ramp meters with excessive queue detectors

被引:0
|
作者
Chaudhary, Nadeem A. [1 ]
Messer, Carroll J. [1 ]
机构
[1] CE/TTI Tower, Texas Transportation Institute, Texas A and M University System, College Station, TX 77843-3135, United States
关键词
D O I
10.3141/1796-09
中图分类号
学科分类号
摘要
Highway engineering
引用
收藏
页码:80 / 85
相关论文
共 50 条
  • [1] Freeway on-ramp design criteria for ramp meters with excessive queue detectors
    Chaudhary, NA
    Messer, CJ
    GEOMETRIC DESIGN AND THE EFFECTS ON TRAFFIC OPERATIONS 2002: HIGHWAY AND FACILITY DESIGN, 2002, (1796): : 80 - 85
  • [2] Research into freeway on-ramp capacity
    Wu, Bing
    Yang, Peikun
    Tongji Daxue Xuebao/Journal of Tongji University, 1999, 27 (04): : 422 - 426
  • [3] Freeway Traffic Density and On-Ramp Queue Control via ILC Approach
    Chi, Ronghu
    Li, Mengze
    Hou, Zhongsheng
    Liu, Xiangpeng
    Yu, Zhaoxu
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [4] On-ramp fuzzy logic control and auxiliary project design of freeway
    Zhang, Sheng-Rui
    Tang, Guo-Xi
    Journal of Traffic and Transportation Engineering, 2006, 6 (04) : 101 - 104
  • [5] Operation reliability for on-ramp junction of urban freeway
    Ci Yu-sheng
    Wu Li-na
    Ling Xian-zhang
    Pei Yu-long
    JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY, 2011, 18 (01): : 266 - 270
  • [6] Review of Freeway On-Ramp Metering Control Methods
    Qin, Jiabin
    Tan, Huachun
    CICTP 2021: ADVANCED TRANSPORTATION, ENHANCED CONNECTION, 2021, : 450 - 457
  • [7] Empirical Analysis of Merging Behavior at Freeway On-Ramp
    Daamen, Winnie
    Loot, Martijn
    Hoogendoorn, Serge P.
    TRANSPORTATION RESEARCH RECORD, 2010, (2188) : 108 - 118
  • [8] An Approach of Controlling Both Freeway On-ramp and Mainline
    Jiang, Nan
    Tang, Shoupeng
    FIRST IITA INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2009, : 683 - 686
  • [9] Operation reliability for on-ramp junction of urban freeway
    Yu-sheng Ci
    Li-na Wu
    Xian-zhang Ling
    Yu-long Pei
    Journal of Central South University of Technology, 2011, 18 : 266 - 270
  • [10] Operation reliability for on-ramp junction of urban freeway
    慈玉生
    吴丽娜
    凌贤长
    裴玉龙
    Journal of Central South University of Technology, 2011, 18 (01) : 266 - 270