Estimate of the Admissible Unbalance Load in Turbogenerator Operation.

被引:0
|
作者
Lemberg, Guenter
机构
来源
Elektrie | 1979年 / 33卷 / 01期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
TURBOGENERATORS
引用
收藏
页码:14 / 16
相关论文
共 50 条
  • [1] ABNORMAL CONDITIONS IN HIGH-POWER TURBOGENERATOR DESIGN AND OPERATION.
    Glebov, I.A.
    Danielevich, Ya.B.
    Mamikonyants, L.G.
    Khutoretskii, G.M.
    Electric Technology, USSR, 1983, (04): : 54 - 64
  • [2] OPTIMUM LOAD BALANCING OF GAS PIPELINE OPERATION.
    Tabata, Kuniaki
    Yui, Shigetomo
    Kojima, Hideo
    Hitachi Review, 1979, 28 (01): : 27 - 30
  • [3] BWR NUCLEAR POWER PLANT LOAD FOLLOWING OPERATION.
    Yamamoto, Fumiaki
    Seino, Takeshi
    Ohtsuka, Shiroh
    Sakakibara, Shinji
    Toshiba review International ed., 1981, (134): : 16 - 20
  • [4] Flow in Multistage Turbines with Long Blades in Low Load and No-Load Operation.
    Riess, W.
    Evers, B.
    VGB-Kraftwerkstechnik, 1985, 65 (11): : 1020 - 1026
  • [5] Cancer of the breast. An attempt to estimate the duration of life after operation.
    Wyard, S
    LANCET, 1925, 1 : 1179 - 1182
  • [6] Load in Converter-Fed DC Machines in Intermittent Operation.
    Schwarz, Juergen
    1978, 32 (11): : 586 - 589
  • [7] An explosion at operation.
    不详
    LANCET, 1931, 1 : 1149 - 1149
  • [8] The shockless operation.
    Lockhart-Mummery, P
    LANCET, 1916, 2 : 249 - 249
  • [9] Simplified operation.
    不详
    MODERN PLASTICS, 1996, 73 (05): : 112 - 112
  • [10] The Bottini operation.
    Freudenbeig, A
    DEUTSCHE MEDIZINISCHE WOCHENSCHRIFT, 1902, 28 : 925 - 927