共 27 条
- [5] Permanent Way Construction on New Lines of the German Federal Railway. Eisenbahningenieur, 1984, 35 (09): : 421 - 423
- [6] Twenty Years of Geometrical Data Processing on the German Federal Railway. Eisenbahningenieur, 1988, 39 (01): : 24 - 27
- [7] TRACK RECONSTRUCTION ON HEAVILY LOADED SECTIONS OF THE GERMAN FEDERAL RAILWAY. Rail International, 1982, 13 (12): : 20 - 36
- [9] Series 120 Three-Phase Locomotive of the German Federal Railway. eb - Elektrische Bahnen, 1987, 85 (06): : 163 - 166
- [10] Purchasing Railway Rolling Stock. Continuity and Changes in the Purchasing Policy of the German Federal Railway. Zeitschrift fuer Eisenbahnwesen und Verkehrstechnik - Glasers Annalen, 1988, 112 (05): : 159 - 162