Capacity at unsignalized two-stage priority intersections

被引:0
|
作者
Brilon, Werner [1 ]
Wu, Ning [1 ]
Lemke, Kerstin [1 ]
机构
[1] Ruhr Univ, Bochum, Germany
关键词
Computer simulation - Intersections - Mathematical models - Parameter estimation;
D O I
10.3141/1555-10
中图分类号
学科分类号
摘要
The subject of this paper is the capacity of minor-street traffic movements across major divided four-lane roadways (also other roads with two separate carriageways) at unsignalized intersections. The center of the intersection, corresponding to the width of the median, often provides room for drivers who have crossed the first half of a major road to stop before proceeding across the second major traffic stream. This situation, which is common with multilane major streets, is called two-stage priority. Here the capacity for minor-street through traffic is larger than at intersections without such a central storage space. The additional capacity being provided by these wider intersections cannot be evaluated by conventional capacity calculation models. An analytical theory is presented for the estimation of capacity under two-stage priority conditions. It is based on an approach by Harders although major improvements were necessary to match the results with realistic conditions. In addition to analytical theory, simulations were performed that enable analysis under more realistic conditions. The result is a set of equations that compute the capacity for minor-street through-traffic movement in two-stage priority situations. These equations are complemented by two sets of graphs that enable easy application of the theory in practice.
引用
收藏
相关论文
共 50 条
  • [1] Capacity at unsignalized two-stage priority intersections
    Brilon, W
    Wu, N
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 1999, 33 (3-4) : 275 - 289
  • [2] A REVIEW OF STOCHASTIC MODELING OF DELAY AND CAPACITY AT UNSIGNALIZED PRIORITY INTERSECTIONS
    CHENG, TCE
    ALLAM, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 60 (03) : 247 - 259
  • [3] A universal procedure for capacity determination at unsignalized (priority-controlled) intersections
    Wu, N
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2001, 35 (06) : 593 - 623
  • [4] Bicycle capacity of borrowed-priority merge at unsignalized intersections in China
    杨小宝
    环梅
    四兵锋
    高亮
    Journal of Beijing Institute of Technology, 2012, 21 (02) : 229 - 233
  • [5] Limited priority merge at unsignalized intersections
    Troutbeck, RJ
    Kako, S
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 1999, 33 (3-4) : 291 - 304
  • [6] THE POTENTIAL CAPACITY OF UNSIGNALIZED INTERSECTIONS
    BAASS, KG
    ITE JOURNAL-INSTITUTE OF TRANSPORTATION ENGINEERS, 1987, 57 (10): : 43 - 46
  • [7] Capacity analysis of unsignalized intersections
    Kyte, M
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 1999, 33 (3-4) : 157 - 160
  • [8] Capacity analysis of unsignalized intersections
    Kyte, M.
    Transportation Research Part A: Policy and Practice, 1999, 33A (3-4): : 157 - 160
  • [9] Field measurements of capacity and delay at unsignalized intersections
    Tian, ZZ
    Kyte, M
    Colyar, J
    ITE JOURNAL-INSTITUTE OF TRANSPORTATION ENGINEERS, 1997, 67 (04): : 22 - 26
  • [10] Capacity at unsignalized intersections derived by conflict technique
    Brilon, W
    Wu, N
    TRAFFIC FLOW THEORY AND HIGHWAY CAPACITY 2001: HIGHWAY OPERATIONS, CAPACITY, AND TRAFFIC CONTROL, 2001, National Research Council (1776): : 82 - 90