共 50 条
- [2] ON THE UTILIZATION ANALYSIS OF A 2-STAGE TRANSFER LINE PRODUCTION SYSTEM SUBJECT TO INTER-STAGE INSPECTION AND INITIAL BUFFER MICROELECTRONICS AND RELIABILITY, 1991, 31 (01): : 59 - 64
- [3] Stochastic analysis of a merge production system with inter-stage inspections Systems Science, 22 (01):
- [4] ANALYSIS OF 2-STAGE TRANSFER-LINE PRODUCTION SYSTEM SUBJECT TO INTER-STAGE INSPECTION AND ARBITRARY ARRIVAL AND PROCESSING TIME DISTRIBUTIONS MICROELECTRONICS AND RELIABILITY, 1992, 32 (04): : 479 - 482
- [6] IMPACT OF INTER-STAGE DYNAMICS ON STALLING STAGE IDENTIFICATION PROCEEDINGS OF THE ASME TURBO EXPO 2011, VOL 7, PTS A-C, 2012, : 1799 - 1808