Small hydro powerplant operation to satisfy irrigation requirements

被引:0
|
作者
Kalkani, E.C. [1 ]
机构
[1] Natl Technical Univ, Athens, Greece
来源
关键词
Hydroelectric power plants;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:54 / 56
相关论文
共 50 条
  • [1] Hydro electric powerplant refurbishment
    Bauer, MA
    30TH ANNUAL FRONTIERS OF POWER CONFERENCE, 1997, PROCEEDINGS, 1997, : U64 - +
  • [2] Dez hydro powerplant development
    Harbi, By A.
    Yagoubi, A.
    Makhtari, K.
    Tanzini, M.
    Gallico, A.
    International Water Power and Dam Construction, 1994, 46 (01): : 14 - 17
  • [3] HIGH HEAD HYDRO POWERPLANT EVALUATION
    GORDON, JL
    HELWIG, PC
    STURGE, LG
    JOURNAL OF ENERGY ENGINEERING-ASCE, 1986, 112 (03): : 153 - 167
  • [4] SMALL HYDRO SUPPLEMENTS IRRIGATION SCHEME.
    Rummel, G.
    Van Weele, B.
    International Water Power and Dam Construction, 1985, 37 (04): : 19 - 25
  • [5] Satisfy HVAC requirements
    Mil Eng, 588 (52):
  • [6] Simulators predict powerplant operation
    Peltier, R
    POWER, 2002, 146 (04) : 43 - +
  • [7] Nutty powerplant begins operation
    Engineers Australia, 2003, 75 (11):
  • [8] Operation and Maintenance problems in hydro turbine material in small hydro power plant
    Kumar, Ravi
    Singal, S. K.
    MATERIALS TODAY-PROCEEDINGS, 2015, 2 (4-5) : 2323 - 2331
  • [9] TOSHIBA CUSTOM GATE ARRAYS SATISFY SMALL-SCALE REQUIREMENTS.
    Anon
    JEE, Journal of Electronic Engineering, 1983, 20 (197): : 53 - 56
  • [10] HIGH HEAD HYDRO-POWERPLANT EVALUATION - CLOSURE
    GORDON, JL
    HELWIG, PC
    STURGE, LG
    JOURNAL OF ENERGY ENGINEERING-ASCE, 1988, 114 (01): : 45 - 46