VALVE SYSTEM FOR BLAST FURNACE TOP GAS TURBINE GENERATOR PLANT.

被引:0
|
作者
FUKATSU, GINICHIRO
TANAKA, TATSUYUKI
机构
来源
| 1982年 / V 59卷 / N 10期
关键词
Compilation and indexing terms; Copyright 2025 Elsevier Inc;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:53 / 57
相关论文
共 50 条
  • [1] HIGH EFFICIENCY BLAST FURNACE GAS FIRING POWER PLANT.
    Soma, Fuyuki
    Takano, Hideki
    Fujikawa, Tokujiro
    Yamaguchi, Kenzo
    Kawasaki Steel Technical Report, 1985, (13): : 174 - 180
  • [2] CONTAMINATIONS AND CORROSION IN BLAST FURNACE GAS TURBINE PLANT
    UMLAND, F
    VOIGT, HP
    STAHL UND EISEN, 1967, 87 (10): : 617 - &
  • [3] Failure Investigation of a Blast Furnace Top Gas Recovery Turbine: Chronology and Mechanism
    Kishore, Kaushal
    Das, Susovan
    Mandal, Himangshu
    Anand, Omji
    Mukhopadhyay, Goutam
    Adhikary, Manashi
    Kumar, Anup
    JOURNAL OF FAILURE ANALYSIS AND PREVENTION, 2020, 20 (04) : 1376 - 1387
  • [4] Failure Investigation of a Blast Furnace Top Gas Recovery Turbine: Chronology and Mechanism
    Kaushal Kishore
    Susovan Das
    Himangshu Mandal
    Omji Anand
    Goutam Mukhopadhyay
    Manashi Adhikary
    Anup Kumar
    Journal of Failure Analysis and Prevention, 2020, 20 : 1376 - 1387
  • [5] Identification and Control of Blast Furnace Gas Top Pressure Recovery Turbine Unit
    Wu, Ping
    Yang, Chun-Jie
    ISIJ INTERNATIONAL, 2012, 52 (01) : 96 - 100
  • [6] PROTECTING THE BLAST-FURNACE IN TOP-GAS RECOVERY TURBINE SYSTEMS
    不详
    IRON AND STEEL INTERNATIONAL, 1980, 53 (02): : 95 - 98
  • [7] Failure Analysis of a Blade of Blast Furnace Top Gas Pressure Recovery Turbine
    Lan, Qiao
    Yang, Gang
    Yang, Yi
    Huang, Shulin
    Liu, Yi
    Zuo, Qian
    Su, Ying
    2016 3RD INTERNATIONAL CONFERENCE ON SMART MATERIALS AND NANOTECHNOLOGY IN ENGINEERING (SMNE 2016), 2016, : 121 - 125
  • [8] Topping turbine generator in blast furnace power house
    Mooney, RE
    Ganga, RC
    ENERGY OPTIONS: COGEN V AND RETAIL WHEELING ALTERNATIVES, TECHNICAL CONFERENCE, PROCEEDINGS, 1996, : 113 - 132
  • [9] Control Computer for Preparing Blast Furnace Burden at Vitkovice Plant.
    Zygma, Antonin
    Trojka, Drahomir
    Ranny, Jiri
    Hutnicke listy, 1984, 39 (02): : 76 - 86
  • [10] Radial gas distribution in the blast furnace top
    Hoogovens Research & Development, Ijmuiden, Netherlands
    Steel Res, 2 (47-53):