ESTIMATING RESOURCES AND COSTS FOR HIGHWAY WORKS - DEVELOPMENT OF THE 'RATE' SYSTEM.

被引:0
|
作者
Parmenter, B.S.
机构
关键词
ROADS AND STREETS - Computer Applications;
D O I
暂无
中图分类号
学科分类号
摘要
The development of a computer system designed to aid management in budgeting, estimating, planning and resource control for highway construction and maintenance is described.
引用
收藏
相关论文
共 50 条
  • [1] ESTIMATING THE TIME COSTS OF HIGHWAY CONGESTION
    DEWEES, DN
    ECONOMETRICA, 1979, 47 (06) : 1499 - 1512
  • [2] Estimating future highway construction costs
    Wilmot, CG
    Cheng, G
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (03): : 272 - 279
  • [3] INNOVATION OF THE INTERSTATE HIGHWAY SYSTEM.
    Gifford, Jonathan L.
    1600, (18 A):
  • [4] HIGHWAY MANAGEMENT A GATEWAY TO AN INTEGRATED SYSTEM.
    Godwin, Alan
    Surveyor, 1987, 168 (4951):
  • [5] ENHANCED CAMAC SERIAL HIGHWAY SYSTEM.
    Cleary, Robert T.
    IEEE Transactions on Nuclear Science, 1985, NS-33 (01)
  • [6] EFFECTIVE TRANSPORT OPERATION IN THE HIGHWAY SYSTEM.
    Allsop, R.E.
    Chapman, R.A.
    Ferguson, J.A.
    1600, (25):
  • [7] ESTIMATING DEVELOPMENT COSTS
    不详
    ENGINEERING, 1969, 207 (5371): : 525 - &
  • [8] Modeling nonmotorized transport costs and benefits in the highway development and management system
    Odoki, J.B.
    Kerali, H.R.
    Transportation Research Record, 1999, (1695): : 5 - 13
  • [9] RESOURCES, THE ENVIRONMENT, AND THE BELL SYSTEM.
    Schlabach, Tom D.
    1600, (50):
  • [10] Alternative methods for estimating full marginal costs of highway transportation
    Ozbay, Kaan
    Bartin, Bekir
    Yanmaz-Tuzel, Ozlem
    Berechman, Joseph
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2007, 41 (08) : 768 - 786