Rehabilitation of Sidi M'Cid suspension bridge, algeria

被引:0
|
作者
Petrangeli, Marco
Petrangeli, Marcello
机构
[1] Tecnoproject, Rome, Italy
[2] Freyssinet Italia, Rome, Italy
关键词
D O I
10.2749/101686600780481374
中图分类号
学科分类号
摘要
The structural rehabilitation of the Sidi M'Cid suspension bridge in Constantine, Algeria, is presented. The bridge, designed by Arnodin in 1908, has a main span of 160 m and a mixed cable-supporting system with a stayed deck portion near the towers. Over time, various components of the bridge had corroded, calling for a structural rehabilitation that included partial replacement of the main suspension system as well as major interventions on both anchorages. Because the bridge spans a canyon 200 m deep, specifically designed equipment was required in order to partially replace the suspension system while maintaining the bridge under full service.
引用
收藏
页码:254 / 258
相关论文
共 50 条
  • [1] Rehabilitation of the Dalian Northern Suspension Bridge
    Qiu, Wenliang
    Wu, Guangrun
    Zhang, Zhe
    STRUCTURAL ENGINEERING INTERNATIONAL, 2019, 29 (02) : 299 - 305
  • [2] Structural rehabilitation of the Kamoro suspension bridge in Madagascar
    Torricelli, L. Ferretti
    Magnani, C.
    Marchiondelli, A.
    Oliva, G.
    MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 607 - 607
  • [3] Rehabilitation of the suspension bridge over Zambezi River in Mozambique
    Reis, A.
    Baptista, C.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 3739 - 3746
  • [4] Sao Vicente Suspension Bridge rehabilitation and cable substitution
    Timerman, R.
    Corres, H.
    Prieto, F.
    Doniak, S.
    MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 221 - 222
  • [5] Rehabilitation of the Suspension Bridge over Zambezi River in Mozambique
    Reis, Antonio
    Baptista, Claudio
    STRUCTURAL ENGINEERING INTERNATIONAL, 2013, 23 (01) : 89 - 93
  • [6] Innovative rehabilitation of the main cables of a suspension bridge in Norway.
    Saul, Reiner
    Nuetzel, Oswald
    STAHLBAU, 2014, 83 (02) : 96 - 100
  • [7] Applicability and structural response for bearing system replacement in suspension bridge rehabilitation
    Kainuma, Shigenobu
    Ahn, Jin-Hee
    Jeong, Young-Soo
    Imamura, Takehiro
    Matsuda, Tetsuo
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2014, 95 : 172 - 190
  • [9] SUSPENSION THERAPY IN REHABILITATION - HOLLIS,M AND ROPER,MHS
    LUCCI, JA
    AMERICAN JOURNAL OF OCCUPATIONAL THERAPY, 1966, 20 (03): : 160 - 160
  • [10] Erosion, Suspended Sediment Transport and Sedimentation on the Wadi Mina at the Sidi M'Hamed Ben Aouda Dam, Algeria
    Hallouz, Faiza
    Meddi, Mohamed
    Mahe, Gil
    Toumi, Samir
    Rahmani, Salah Eddine Ali
    WATER, 2018, 10 (07)