共 50 条
- [4] Turnkey automation saves up to 40% of installation costs [J]. Water and Wastewater International, 2003, 18 (06): : 35 - 37
- [5] PIPELINE TOW CUTS INSTALLATION COSTS OFFSHORE TUNISIA [J]. OIL & GAS JOURNAL, 1995, 93 (09) : 45 - 49
- [6] Pipeline tow cuts installation costs offshore Tunisia [J]. Oil and Gas Journal, 1995, 93 (09): : 45 - 49
- [8] Dual-containment piping system saves installation costs, improves safety [J]. MICRO, 1995, 13 (07): : 104 - 105