Genetic algorithms for the two-stage bicriteria flowshop problem

被引:0
|
作者
Mississippi State Univ, Mississippi State, United States [1 ]
机构
来源
Eur J Oper Res | / 2卷 / 356-373期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Genetic algorithms for the two-stage bicriteria flowshop problem
    Neppalli, VR
    Chen, CL
    Gupta, JND
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 95 (02) : 356 - 373
  • [2] Bicriteria in a two-stage flowshop scheduling problem
    Bagga, PC
    Bhambani, A
    [J]. INDIAN JOURNAL OF PURE & APPLIED MATHEMATICS, 2000, 31 (11): : 1475 - 1481
  • [3] Heuristic algorithms for the two-stage hybrid flowshop problem
    Haouari, M
    M'Hallah, R
    [J]. OPERATIONS RESEARCH LETTERS, 1997, 21 (01) : 43 - 53
  • [4] The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time
    Ali Allahverdi
    Fawaz S. Al-Anzi
    [J]. The International Journal of Advanced Manufacturing Technology, 2008, 37 : 166 - 177
  • [5] The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time
    Allahverdi, Ali
    Al-Anzi, Fawaz S.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 37 (1-2): : 166 - 177
  • [6] Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan
    Al-Anzi, Fawaz S.
    Allahverdi, Ali
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (09) : 2682 - 2689
  • [7] An FPTAS for the parallel two-stage flowshop problem
    Dong, Jianming
    Tong, Weitian
    Luo, Taibo
    Wang, Xueshi
    Hu, Jueliang
    Xu, Yinfeng
    Lin, Guohui
    [J]. THEORETICAL COMPUTER SCIENCE, 2017, 657 : 64 - 72
  • [8] A two-stage flexible flowshop problem with deterioration
    Gong, Hua
    Tang, Lixin
    [J]. COMPUTING AND COMBINATORICS, PROCEEDINGS, 2008, 5092 : 651 - 660
  • [9] A hybrid two-stage flowshop scheduling problem
    He, Longmin
    Sun, Shijie
    Luo, Runzi
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2007, 24 (01) : 45 - 56
  • [10] 2-STAGE FLOWSHOP SCHEDULING PROBLEM WITH BICRITERIA
    RAJENDRAN, C
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1992, 43 (09) : 871 - 884