共 50 条
- [1] EXPERIENCE GAINED FROM ERECTION AND COMMISSIONING OF THE 940 MW NUCLEAR-POWER PLANT AT LEIBSTADT [J]. BROWN BOVERI REVIEW, 1984, 71 (3-4): : 104 - 114
- [3] EXPERIENCE WITH EXTENDED POWER UPRATE AT LEIBSTADT NUCLEAR POWER PLANT [J]. PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE, VOL 7, 2009, : 71 - 78
- [5] Nuclear power plant commissioning experience [J]. PROGRESS IN NUCLEAR ENERGY, 2011, 53 (06) : 668 - 672
- [6] Experience in the Starting Up of the Leibstadt Nuclear Power Plant. [J]. VGB-Kraftwerkstechnik, 1986, 66 (05): : 427 - 432
- [8] EXPERIENCE GAINED FROM, AND RESULTS OF STAFF TRAINING AT 440 MW NUCLEAR-POWER PLANT UNIT SIMULATOR [J]. KERNENERGIE, 1976, 19 (04): : 132 - 136
- [9] Leibstadt Nuclear Power Plant (Before Completion). [J]. VGB-Kraftwerkstechnik, 1980, 60 (05): : 333 - 344
- [10] Experience gained from commissioning a new 411 MW coal-fired plant with advanced steam data [J]. Jensen, V, 2000, VGB-Kraftwerkstechnik GmbH, Essen, Germany (80):