Modifications solve desulfurization unit start-up problems

被引:0
|
作者
Reicher, Myron [1 ]
Niemiec, Bill [1 ]
Katona, Tamas [1 ]
机构
[1] USFilter, Schaumburg, United States
来源
| 1600年 / PennWell Publ Co, Tulsa, OK, United States卷 / 98期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Modifications solve desulfurization unit start-up problems
    Reicher, M
    Niemiec, B
    Katona, T
    OIL & GAS JOURNAL, 2000, 98 (11) : 55 - +
  • [2] SOLVE CENTRIFUGAL COMPRESSOR PROBLEMS BEFORE START-UP
    DWYER, JJ
    CHEMICAL ENGINEERING PROGRESS, 1974, 70 (10) : 71 - 74
  • [3] Hydropower unit start-up costs
    Bakken, BH
    Bjorkvoll, T
    2002 IEEE POWER ENGINEERING SOCIETY SUMMER MEETING, VOLS 1-3, CONFERENCE PROCEEDINGS, 2002, : 1522 - 1527
  • [4] Siemens optimizes start-up sequences in a power plant unit - New unit start-up simulator reduces costs
    Zaviska, O.
    Reichel, H.
    VGB PowerTech, 2001, 81 (07): : 4 - 5
  • [5] Updating controls improves unit start-up
    Zwers, J
    POWER ENGINEERING, 2004, 108 (04) : 46 - +
  • [6] Updating controls improves unit start-up
    Zwers, Joe
    Power Engineering (Barrington, Illinois), 2004, 108 (04): : 46 - 48
  • [7] Start-up problems of sludge dewatering facility
    Hansen, B.E.
    Garrison, W.E.
    Smith, D.L.
    Journal of the Water Pollution Control Federation, 1980, 52 (10): : 2558 - 2570
  • [8] START-UP PROBLEMS WITH NEW SKIPPING EQUIPMENT
    SULIS, E
    CIM BULLETIN, 1986, 79 (888): : 27 - 28
  • [9] START-UP PROBLEMS OF SLUDGE DEWATERING FACILITY
    HANSEN, BE
    GARRISON, WE
    SMITH, DL
    JOURNAL WATER POLLUTION CONTROL FEDERATION, 1980, 52 (10): : 2558 - 2570
  • [10] Understanding start-up problems in yeast glycolysis
    Overal, Gosse B.
    Teusink, Bas
    Bruggeman, Frank J.
    Hulshof, Josephus
    Planque, Robert
    MATHEMATICAL BIOSCIENCES, 2018, 299 : 117 - 126