共 4 条
- [1] Necessity of Measurements of Overhead Contact Installations at the West German Railroad System (DB). eb - Elektrische Bahnen, 1983, 81 (11): : 336 - 340
- [2] Optimal Load Distribution in the 110-kV railroad Power Supply Network of the West German Railroad System. eb - Elektrische Bahnen, 1979, 77 (09): : 258 - 262
- [3] Considerations on the Utilization of Monitor Techniques and Electronic Data Processing in Central Control Installations Exemplified by the Conditions Prevailing in the 16-2/3-Hz Railroad Power Supply of the West German Railroad System (DB), with Due Regard to Operational Demands. eb - Elektrische Bahnen, 1982, 80 (12): : 340 - 346
- [4] Application of Computers for Optimal Load Distribution within the 110-kV-Traction Network of the West German Railroad System. eb - Elektrische Bahnen, 1978, 49 (02): : 47 - 55