MAIN RIVER SPAN STRUCTURE OF THE GATEWAY BRIDGE.

被引:0
|
作者
Matt, Peter
Voumard, Jean-Marc
Marti, Peter
Thurlimann, Bruno
Voumard, Jean-Marc
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
30
引用
收藏
页码:34 / 43
相关论文
共 50 条
  • [1] The erection of the suspended structure of the Delaware River Bridge.
    Cone, RG
    JOURNAL OF THE FRANKLIN INSTITUTE, 1926, 201 : 691 - 711
  • [2] GROOT RIVER BRIDGE.
    Reffell, D.E.
    Parolis, H.C.
    Labrum, P.R.
    Civil engineer in South Africa, 1984, 26 (04): : 175 - 179
  • [3] TEMPORARY MAIN CROSSES BRIDGE.
    Reynolds, Ted
    1600, (214):
  • [4] MONITORING THE LIFE OF A THREE SPAN BRIDGE.
    Robin, Claire
    Surveyor, 1987, 168 (4942): : 15 - 17
  • [5] ERECTING THE CENTER SPAN OF THE FREMONT BRIDGE.
    Tokola, Alpo J.
    Wortman, Edward J.
    1600, (43):
  • [6] DYNAMIC SOIL-STRUCTURE INTERACTION OF A SINGLE-SPAN BRIDGE.
    Crouse, C.B.
    Hushmand, B.
    Martin, G.R.
    Earthquake Engineering & Structural Dynamics, 1987, l5 (06):
  • [7] LA PLATA RIVER BRIDGE.
    Anon
    PCI Journal, 1988, 33 (01): : 158 - 164
  • [8] Design of main navigable span bridge of Chizhou Changjiang River Highway Bridge
    China Railway Major Bridge Reconnaissance & Design Group Co., Ltd., Wuhan
    430056, China
    Bridge Constr., 4 (92-96):
  • [9] Construction of the cables of the Delaware River Bridge.
    Robinson, HD
    JOURNAL OF THE FRANKLIN INSTITUTE, 1926, 201 : 735 - 775
  • [10] Cable calculations for the Delaware River Bridge.
    Rapp, GM
    JOURNAL OF THE FRANKLIN INSTITUTE, 1926, 201 : 712 - 735