NEW APPROACH TO AGGREGATE PRODUCTION PLANNING.

被引:0
|
作者
Akinc, Umit [1 ]
Roodman, Gary M. [1 ]
机构
[1] Wake Forest Univ, Winston-Salem, NC,, USA, Wake Forest Univ, Winston-Salem, NC, USA
关键词
D O I
暂无
中图分类号
学科分类号
摘要
10
引用
收藏
页码:88 / 94
相关论文
共 50 条
  • [1] CLOSING THE MARKETING LOOP IN AGGREGATE PRODUCTION PLANNING.
    Aucamp, D.C.
    1600, (10):
  • [2] A NEW APPROACH TO AGGREGATE PRODUCTION PLANNING
    AKINC, U
    ROODMAN, GM
    IIE TRANSACTIONS, 1986, 18 (01) : 88 - 94
  • [3] A new robust fuzzy approach for aggregate production planning
    Rahmani, D.
    Yousefli, A.
    Ramezanian, R.
    SCIENTIA IRANICA, 2014, 21 (06) : 2307 - 2314
  • [4] A new robust fuzzy approach for aggregate production planning
    Rahmani, D. (drahmani@kntu.ac.ir), 1600, Sharif University of Technology (21):
  • [5] NEW APPROACH TO OVERHAUL REPAIR WORK PLANNING.
    Smith Jr., Bertram D.
    1600, (96):
  • [6] MODEL APPROACH TO PLANNING.
    Anon
    World dredging & marine construction, 1984, 20 (01): : 31 - 33
  • [7] Aggregate production planning - a multiple objective approach
    Rosen, L. Drew
    Canel, Cem
    JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2009, 12 (02): : 287 - 303
  • [8] SYSTEMS APPROACH TO POWER PLANNING.
    Thon, J.George
    1973, 99 (HY4): : 589 - 598
  • [9] APPROACH FOR ADVANCE RELIABILITY PLANNING.
    Thomas, Marlin U.
    Proceedings of the Annual Reliability and Maintainability Symposium, 1981, : 422 - 442
  • [10] APPROACH TO INFORMATION TECHNOLOGY PLANNING.
    Pollard, S.J.
    Crawford, C.R.
    ICL technical journal, 1986, 5 (02): : 228 - 252