共 50 条
- [2] Modelling industrial wastewater ozonation in bubble contactors. 1. Rate coefficient determination OZONE SCI. ENG., 4 (355-378):
- [3] Considerations for scale-up: Moving from the bench to the pilot plant ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2013, 245
- [4] Considerations for Scale-Up Moving from the Bench to the Pilot Plant to Full Production ACADEMIA AND INDUSTRIAL PILOT PLANT OPERATIONS AND SAFETY, 2014, 1163 : 37 - 45
- [5] Hollow Fiber Membrane Contactors for Post-Combustion CO2 Capture: A Scale-Up Study from Laboratory to Pilot Plant OIL AND GAS SCIENCE AND TECHNOLOGY-REVUE D IFP ENERGIES NOUVELLES, 2014, 69 (06): : 1035 - 1045