共 50 条
- [1] AEROTRIANGULATION WITHOUT GROUND CONTROL PHOTOGRAMMETRIC ENGINEERING AND REMOTE SENSING, 1987, 53 (03): : 311 - 314
- [3] PROJECT MANAGEMENT AND CONTROL REQUIREMENTS. British Telecom technology journal, 1986, 4 (03): : 124 - 129
- [4] TRACK REHABILITATION AND MAINTENANCE RESEARCH REQUIREMENTS. United States Federal Railroad Administration, Report, 1980,
- [6] Tiered approach for ground-water study requirements. ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 1998, 216 : U123 - U123
- [7] Adapter Rails in Rolling Mill Furnaces Reduce Energy Requirements. Baender Bleche Rohre, 1984, 25 (05): : 115 - 116
- [8] A safety technical language for the description of control requirements. ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 1999, 94 (11): : 660 - 664
- [9] NOISE CONTROL DESIGN AND ABET DESIGN REQUIREMENTS. Mechanical Engineering News (Washington, DC), 1986, 23 (01): : 13 - 15
- [10] AEROTRIANGULATION BLOCK ADJUSTMENT WITHOUT NEW GROUND CONTROL SURVEYING PHOTOGRAMMETRIC ENGINEERING AND REMOTE SENSING, 1979, 45 (06): : 794 - 794