NEW MONITORING SYSTEM FOR HIGH-CAPACITY GENERATING UNITS.

被引:0
|
作者
Orlovskii, V.V.
Tolkachev, N.F.
机构
来源
| 1600年 / 19期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Two versions of a unit control center for a 300 MW unit are described. In one of them, the instruments for operative monitoring are arranged in mnemonic order on vertical panels and on a desk, and in an improved version, only on a desk. The recommendation is given that the instruments of the unit control system be built into the mnemonic schemic in such a way that the indicators of the instruments form a straight line or are slightly staggered.
引用
收藏
相关论文
共 50 条