共 50 条
- [2] New light rail transit system in Hong Kong [J]. Schweizer Ingenieur und Architekt, 1988, 106 (33-34): : 940 - 947
- [4] An Optimal Crew Scheduling Model for Urban Rail Transit [J]. PROCEEDINGS OF 2010 3RD IEEE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY (ICCSIT 2010), VOL 6, 2010, : 113 - 116
- [7] SUSTAINABLE RAIL TRANSIT SERVICES - A CASE STUDY IN HONG KONG [J]. TRANSPORTATION STUDIES: SUSTAINABLE TRANSPORTATION, PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE OF HONG KONG SOCIETY FOR TRANSPORTATION STUDIES, 2006, : 79 - 88
- [8] Modeling and solving urban rail transit crew pairing problems [J]. Tiedao Xuebao/Journal of the China Railway Society, 2014, 36 (05): : 1 - 7
- [9] The Implementation Mode of Urban Rail Based Transit Joint Development-Experiences from United States, Japan and Hong Kong [J]. ADVANCED TRANSPORTATION, PTS 1 AND 2, 2011, 97-98 : 1149 - +
- [10] Engineering Works Scheduling for Hong Kong's Rail Network [J]. PROCEEDINGS OF THE TWENTY-EIGHTH AAAI CONFERENCE ON ARTIFICIAL INTELLIGENCE, 2014, : 2890 - 2897