共 16 条
- [4] Application of leak-before-break to primary loop piping to eliminate pipe whip restraints in a Spanish nuclear power plant Rodriguez, M., 1600, (43): : 1 - 3
- [5] LEAK-BEFORE-BREAK APPLICATION IN LIGHT-WATER-REACTOR PLANT PIPING NUCLEAR SAFETY, 1989, 30 (02): : 189 - 200
- [8] Limit load and stability analysis of 500 MWe PHT elbow with throughwall cracks for leak-before-break qualifications INTERNATIONAL CONFERENCE ON ASSURING IT'S SAFE: INTEGRATING STRUCTURAL INTEGRITY, INSPECTION, AND MONITORING INTO SAFETY AND RISK ASSESSMENT, 1998, 1998 (06): : 179 - 188
- [9] TACIS-program 91/1.2: Leak-before-break in primary piping of VVER 440/230 ANNUAL MEETING ON NUCLEAR TECHNOLOGY '96, 1996, : 159 - 162