Satellite subsea development starts up in North Sea

被引:0
|
作者
机构
来源
Oil and Gas Journal | 1996年 / 94卷 / 39期
关键词
Performance criteria - Satellite subsea development - Subsea completion - Wellhead conversion;
D O I
暂无
中图分类号
学科分类号
摘要
New subsea technology, horizontal drilling, and the existing North Sea infrastructure allowed BP Exploration Operating Co. Ltd. to develop the Newsham field, a small 1967 gas discovery. The development is in 30 m of water (98 ft) and the subsea well is tied-back to the West Sole pipeline system. The development included: Converting a mudline suspension system to a subsea wellhead; Deploying a horizontal subsea tree; Producing gas from a subsea wellhead; Deploying the subsea tree from a jack up drilling rig; Installing an overtrawlable wellhead protection structure.
引用
收藏
页码:89 / 90
相关论文
共 50 条