TOP EFFICIENCY IS GOAL IN T&S OPERATIONS.

被引:0
|
作者
Anon
机构
来源
Railway Track and Structures | 1975年 / 71卷 / 11期
关键词
D O I
暂无
中图分类号
U2 [铁路运输];
学科分类号
摘要
The paper reports how out-of-face tie-renewal and surfacing operations are performed on the Southern by highly mechanized system gangs. The gangs are organized around machines that take out old ties in one piece, thus reclaiming some ties that can be reused in yard or secondary tracks.
引用
收藏
页码:24 / 27
相关论文
共 50 条