The March issue of this journal contains 15 papers describing parts of Solmer's new oxygen steelmaking plant now under construction at Fos (Marseilles). Annual steel production is planned to reach 3. 5 million tons in 1976, and maximum production is expected to be 7 million tons. The present chapter describes the construction of the two blast furnaces, one of which is expected to start operation in 1974, as well as the charging equipment. Blast conditioning, the casting bays, cleaning operations, power and water supply, and control equipment are also discussed.
机构:
Gerencia de Metalurgia e Qualidade, da Cosipa, Cubatao, Braz, Gerencia de Metalurgia e Qualidade da Cosipa, Cubatao, BrazGerencia de Metalurgia e Qualidade, da Cosipa, Cubatao, Braz, Gerencia de Metalurgia e Qualidade da Cosipa, Cubatao, Braz
Ribeiro de Carvalho, Claudio
Pinto Goes, Jeferson Jose
论文数: 0引用数: 0
h-index: 0
机构:
Gerencia de Metalurgia e Qualidade, da Cosipa, Cubatao, Braz, Gerencia de Metalurgia e Qualidade da Cosipa, Cubatao, BrazGerencia de Metalurgia e Qualidade, da Cosipa, Cubatao, Braz, Gerencia de Metalurgia e Qualidade da Cosipa, Cubatao, Braz
Pinto Goes, Jeferson Jose
Aparecido Vieira Prado, Jose
论文数: 0引用数: 0
h-index: 0
机构:
Gerencia de Metalurgia e Qualidade, da Cosipa, Cubatao, Braz, Gerencia de Metalurgia e Qualidade da Cosipa, Cubatao, BrazGerencia de Metalurgia e Qualidade, da Cosipa, Cubatao, Braz, Gerencia de Metalurgia e Qualidade da Cosipa, Cubatao, Braz