Driving of an Air Shaft with a Cross-Section of 40 sq m by Means of Mechanical Breakup Platforms.

被引:0
|
作者
Meyer, Guenther
Beyer, Klaus
机构
来源
Neue Bergbautechnik | 1976年 / 6卷 / 01期
关键词
MINE VENTILATION;
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
The use of Soviet-made mechanical breakup platforms of KPW 1 A type for driving air shafts in the compact rock is described. The results and practical experience with the driving of two shafts are detailed, and technical equipment is described. Economic advantages and technical safety of this method are briefly outlined.
引用
收藏
页码:28 / 34
相关论文
共 3 条
  • [1] SEQUENTIAL BREAKUP CROSS-SECTION OF LI-6 BY CA-40
    VANVERST, SP
    SANDERSON, DP
    KEMPER, KW
    SHAPIRA, D
    VARNER, RL
    SHIVAKUMAR, B
    PHYSICAL REVIEW C, 1987, 36 (05): : 1865 - 1869
  • [2] Research of a Wind Tunnel Parameters by Means of Cross-Section Analysis of Air Flow Profiles
    Yanovych, Vitalii
    Duda, Daniel
    Horacek, Vit
    Uruba, Vaclav
    18TH CONFERENCE OF POWER SYSTEM ENGINEERING, THERMODYNAMICS AND FLUID MECHANICS, 2019, 2189
  • [3] ENERGY-SPECTRUM OF SURVIVING PRIMARY PROTONS WITH ENERGIES (3 DIVIDED BY 30)TEV AT 5200 M ASL AND CROSS-SECTION FOR PROTON-AIR-NUCLEUS COLLISIONS
    AGUIRRE, C
    TREPP, A
    MEJIA, GR
    MURAKAMI, K
    KAMATA, K
    TOYODA, Y
    MAEDA, T
    YOKOYAMA, C
    MACKEOWN, PK
    SUGA, K
    UCHINO, K
    KANEKO, T
    NUOVO CIMENTO DELLA SOCIETA ITALIANA DI FISICA B-GENERAL PHYSICS RELATIVITY ASTRONOMY AND MATHEMATICAL PHYSICS AND METHODS, 1975, B 27 (02): : 263 - 282