摘要
The offshore pilot test of Exxon's Submerged Production System (SPS) has reached a successful conlcusion. This pilot test encompassed the entire spectrum of SPS equipment, spanning from the well completion intervals to, but not including, common surface processing and storage facilities. Since the SPS is designed to meet all the life cycle needs of a subsea field, one of the objectives of the pilot test was to evaluate both the techniques and the equipment used to install, operate, and maintain a prototype version of the SPS. The equipment under test was designed for use in water depths up to 2000 feet, but with minor modifications it is capable of operating in significantly greater depths. Evaluation of pilot test results has shown that the deep water installation techniques are practicable and that the deep water maintenance machinery is competent to repair any failures likely to occur in an operating system. One of the most significant problems in conducting the pilot test was achieving adequate quality control during equipment manufacture.
引用
收藏
页码:801 / 806
相关论文
共 50 条
  • [1] SUBMERGED PRODUCTION SYSTEM - A FINAL REPORT
    BURKHARDT, JA
    CHILDERS, TW
    ANDERSON, RE
    LOTH, WD
    MICHIE, TW
    JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 1980, 102 (01): : 30 - 34
  • [2] SUBMERGED PRODUCTION SYSTEM - A FINAL REPORT
    BURKHARDT, JA
    CHILDERS, TW
    ANDERSON, RE
    LOTH, WD
    MICHIE, TW
    JOURNAL OF PETROLEUM TECHNOLOGY, 1980, 32 (05): : 899 - 903
  • [3] VIKING SEISMOMETRY FINAL REPORT.
    Lazarewicz, Andrew R.
    Anderson, Don L.
    Anderson, Kenneth
    Dainty, Anton M.
    Duennebier, Frederick K.
    Goins, Neal R.
    Knight, Tony C.D.
    Kovach, Robert L.
    Latham, Gary V.
    Miller, Wayne F.
    Nakamura, Yosio
    Sutton, George H.
    Toksoz, M.Nafi
    NASA Contractor Reports, 1981, (CR-3408):
  • [5] EQLIPSE (evaluation and quality in library performance: system for Europe) Final Report.
    Winzenried, A
    ELECTRONIC LIBRARY, 1998, 16 (06): : 404 - 404
  • [6] RESIDENTIAL LOAD MANAGEMENT FINAL REPORT.
    Stelmach, A.L.
    Cartier, J.P.
    Research and Development Report - Canadian Electrical Association, 1982, (914 u 161):
  • [7] The family unification program: Final evaluation report.
    Fraser, MW
    RESEARCH ON SOCIAL WORK PRACTICE, 1999, 9 (02) : 268 - 269
  • [8] COMPARISON OF COAL LIQUEFACTION PROCESSES, FINAL REPORT.
    Rogers, K.A.
    Wilk, A.S.
    McBeath, B.C.
    Hill, R.F.
    1978,
  • [9] EVALUATION OF SIGNAL/CONTROL SYSTEM EQUIPMENT AND TECHNOLOGY - 1. SUMMARY AND FINAL REPORT.
    Taylor, Stewart F.
    United States, Federal Railroad Administration, Office of Research and Development, (Report) FRA/O, 1981,
  • [10] ISOTOPE ENRICHMENT IN ZIRCONIUM WITH A PLASMA CENTRIFUGE - FINAL REPORT.
    Schmeing, H.
    Buyers, W.J.L.
    Dolling, G.
    Atomic Energy of Canada Limited, AECL (Report), 1983,