共 50 条
- [1] Research of Self Pre-Stress Test of Concrete-Filled Steel Tube Arch Rib TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 1307 - +
- [3] PARAMETRIC STUDY ON ULTIMATE BEARING CAPACITY OF CONCRETE-FILLED STEEL TUBE RIB ARCH PROCEEDINGS OF THE TENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING FOR YOUNG EXPERTS, VOLS I AND II, 2008, : 810 - 814
- [5] Creep behavior of concrete-filled steel tubular arch rib Gongcheng Lixue/Engineering Mechanics, 2007, 24 (06): : 79 - 85
- [8] Simulation of girth welding seam of large diameter arch rib of concrete-filled steel tube arch bridge Hanjie Xuebao/Transactions of the China Welding Institution, 2020, 41 (10): : 79 - 86
- [9] Vacuum aided concrete grouting process test of concrete filled steel tube arch segment Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2014, 27 (06): : 44 - 50
- [10] Design Optimization of Concrete-Filled Steel Tube Arch Bridge 3RD INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, ICCEASI 2015, 2015, : 733 - 737