SECOR OPERATIONS: PRODUCTION OF CONTINUOUS COPPER ROD AND SUBSEQUENT WIREDRAWING.

被引:0
|
作者
Dundurs, Ian A.
Hoey, Douglas W.
Walter, Craig W.
机构
来源
Wire journal | 1980年 / 13卷 / 09期
关键词
WIRE ROD;
D O I
暂无
中图分类号
学科分类号
摘要
The Secor (Secim Continuous Rod) plant was commissioned in December 1977 at Copper Refineries Pty. Ltd. , Townsville, Queensland, Australia. Advances by the technique are low capital and labor costs, reduced floor space, reduced operator hazard, and the benefits of the RER rolling method.
引用
收藏
页码:120 / 125
相关论文
共 50 条