Texas power plant upgrades restore lost megawatts to meet summer demand

被引:0
|
作者
Odenthal, Tom [1 ]
机构
[1] Entergy's Sabine Plant, Bridge City, TX, United States
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:49 / 50
相关论文
共 4 条
  • [1] Texas power plant upgrades restore lost megawatts to meet summer demand
    Odenthal, T
    POWER ENGINEERING, 2002, 106 (03) : 49 - 50
  • [2] NEW PLANT DOUBLES TEXAS DAIRYS VOLUME TO MEET RISING DEMAND
    SAAL, H
    AMERICAN DAIRY REVIEW, 1974, 36 (10): : 18 - &
  • [3] Efficiency improvement for geothermal power generation to meet summer peak demand
    Sohel, M. Imroz
    Sellier, Mathieu
    Brackney, Larry J.
    Krumdieck, Susan
    ENERGY POLICY, 2009, 37 (09) : 3370 - 3376
  • [4] Application of Alternative Configuration of Cogeneration Plant in order to Meet Power and Water Demand
    Ghelichzadeh, Jalal
    Derakhshan, Rojin
    Asadi, Azadeh
    PRES 2012: 15TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, 2012, 29 : 775 - 780