Integrated system to develop highway rehabilitation projects

被引:0
|
作者
Khan, Sarosh I. [1 ]
Ritchie, Stephen G. [1 ]
Kampe, Karl [1 ]
机构
[1] Univ of California, Irvine, United States
关键词
Computer aided engineering - Database systems - Expert systems - Highway administration - Maintenance - Project management - Reconstruction (structural) - Repair;
D O I
暂无
中图分类号
学科分类号
摘要
Highway resurfacing, restoration, rehabilitation, and reconstruction can extend the life of an existing facility. At the same time, enhanced safety can be engineered into a project by making improvements to other features that relate to, for example, bridge improvements, minor widening of lanes and shoulders, and minor alterations to horizontal and vertical alignment, in addition to pavement resurfacing and repair. Recent rehabilitation projects in California that were expanded to include safety enhancements resulted in original project-cost estimates underestimating costs, often by millions of dollars. This paper presents an integrated database-management expert-system computer program (4RSCOPE), which is a design tool to address this problem. The program has been developed to allow Caltrans engineers to gather data from both office records and field assessments, determine the design features to be included, and thus determine the project scope. The program is expected to become the standard system used by district engineers statewide in California to develop rehabilitation projects.
引用
收藏
页码:1 / 20
相关论文
共 50 条
  • [1] INTEGRATED SYSTEM TO DEVELOP HIGHWAY REHABILITATION PROJECTS
    KHAN, SI
    RITCHIE, SG
    KAMPE, K
    JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1994, 120 (01): : 1 - 20
  • [2] Data on highway maintenance, rehabilitation, and mobility projects for integrated planning in Texas
    France-Mensah, Jojo
    Kothari, Chirag
    O'Brien, William J.
    Khwaja, Nabeel
    DATA IN BRIEF, 2019, 25
  • [3] Developing a Traffic Closure Integrated Linear Schedule for Highway Rehabilitation Projects
    Sharma, Haribol
    McIntyre, Charles
    Gao, Zhili
    Nguyen, Tang-Hung
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (03): : 146 - 155
  • [4] EVALUATION OF PROJECTS FOR REHABILITATION OF HIGHWAY BRIDGES
    SOBANJO, JO
    STUKHART, G
    JAMES, RW
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1994, 120 (01): : 81 - 99
  • [5] Evaluation of projects for rehabilitation of highway bridges
    Sobanjo, J.O.
    Stukhart, George
    James, Ray W.
    Journal of Structural Engineering, 1994, 120 (01) : 81 - 99
  • [6] Agent system model of highway projects
    Li, Jun
    Cui, Miao
    Liu, Jiang
    Beijing Gongye Daxue Xuebao / Journal of Beijing University of Technology, 2007, 33 (11): : 1182 - 1186
  • [7] Determining the Most Economical Work Zone Lengths for Rural Highway Rehabilitation Projects
    Yin, Yangtian
    Choi, Kunhee
    Lee, Yong-Cheol
    Jeong, H. David
    Liu, Xin
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2023, 39 (02)
  • [8] Knowledge-based scheduling analysis software for highway rehabilitation and reconstruction projects
    Lee, EB
    Harvey, JT
    Samadian, MM
    CONSTRUCTION 2005, 2005, (1907): : 15 - 24
  • [9] Dynamic Contract Time Determination System for Highway Projects
    Abdel-Raheem, Mohamed
    Torres Cantu, Cuauhtemoc
    Wang, Xiaohui
    TRANSPORTATION RESEARCH RECORD, 2020, 2674 (05) : 381 - 392
  • [10] Automated contract time determination system for highway projects
    Jeong, Hyung Seok
    Atreya, Siddharth
    Oberlender, Garold D.
    Chung, BooYoung
    AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 957 - 965